Hwy. 218 work delayed until July 9

Posted

MOUNT PLEASANT - Due to recent rains and anticipated rainfall, the planned closure of the roadway and bridge over the Skunk River on northbound U.S. 218 between Henry County Road J-20 (mile marker 33.68) and River Road (mile marker 38.08) near Salem will now occur from 6 a.m. to 6 p.m. Monday, July 9, weather permitting, according to the Iowa Department of Transportation’s Mount Pleasant construction office.

The bridge closure and signed detour are expected to be in place for 12 hours. Motorists will be directed around the work zone using the signed detour route, which includes Henry County Road J-20.

Local traffic along U.S. 218 will have access to U.S. 218 except for the northbound lanes crossing the bridge over Skunk River.

The Iowa DOT reminds motorists to drive with caution, obey the posted speed limit and other signs in the work area, and be aware that traffic fines for moving violations are at least double in work zones. As in all work zones, drivers should stay alert, allow ample space between vehicles, and wear seat belts.

The latest traveler information is available anytime through our 511 system. Visit 511ia.org; call 511 (within Iowa) or 800-288-1047 (nationwide); stay connected with 511 on Facebook or Twitter (find links at https://iowadot.gov/511/511-social-media-sites); or download the free app to your mobile device.

construction, detour, Hwy 218, lane closures, Mt. Pleasant, Pen City Current, Skunk River

Comments

No comments on this item Please log in to comment by clicking here